Quantcast
pixel

outdoor projects

2008.07.21
You can see how fast the lawn has grown in the three days that Tracy last mowed it. Crazy!

Our driveway was poured just over two months ago. The middle section (that is now gone) developed a crack from one side to the other just two days after it was poured! It's taken the concrete company all this time to finally come out and get it fixed. They kept saying "next week, we promise." Yeah, right! Why do I have feeling that I'm going to be looking at that eyesore for the next two weeks?!

Ugly rebar.

The builder has been waiting to put the backfill in along the driveway until the crack gets repaired, so we've been looking at this pile of dirt for over two months. Look at the size of those weeds! You can't see it, but there is a wheelbarrow hiding in there.

Since they were here to work on the driveway anyway, Tracy decided to have a concrete pad installed behind the garage. I think this is where he is going to keep the lawn mower and his ATV.

Bold Text
Italic Text
UnderLine Text
URL Link

Name
URL
Enter the code to the right below
Captcha

Views: 79
 
pixel
« 2008.07.20
 
pixel
2008.07.23 »
pixel