You are either already subscribed or there was an error
Your entry has been submitted
Sorry, your entry could not be submitted
Father's Family Work Day
2009.06.22
Travis took out walls and redrywalled their master bathroom. It was a horrible design and now going to be a good sized room to work with. Splarah helped him 'mud'.
Click here to add text
Travis took out walls and redrywalled their master bathroom. It was a horrible design and now going to be a good sized room to work with. Splarah helped him 'mud'.
1
The tub/shower is the one thing in the bathroom already done. The wall dividing the washer/dryer area is knocked down half way for opening the room more.
Click here to add text
The tub/shower is the one thing in the bathroom already done. The wall dividing the washer/dryer area is knocked down half way for opening the room more.
2
Travis has been making stair rails slowly this past year. Just a bit more to do. Their place has three levels.
Click here to add text
Travis has been making stair rails slowly this past year. Just a bit more to do. Their place has three levels.
3
Monte and Dawson made bookshelves and they're already filling up (taken July 4th).
Click here to add text
Monte and Dawson made bookshelves and they're already filling up (taken July 4th).
4
Sarah and I replanted plants from my greenhouse and seeds since hail had damage so much! Heather helped weed and plant a bit too. I'll post pics of her and Will on the 23rd date.
Click here to add text
Sarah and I replanted plants from my greenhouse and seeds since hail had damage so much! Heather helped weed and plant a bit too. I'll post pics of her and Will on the 23rd date.
5
We went to Travis and Sarah's home to work since they couldn't come our way for Father's Day. 'We' is: Monte, me, Heather and Will. Then Dawson and Splarah came separate later.