pixel
« 
pixel
«  
  »
pixel
S M T W T F S
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
 »
pixel

Building Progress...5th Dec.

2011.12.05
pixel
From the LHS...garage, kitchen with back door entrance, dining area with sliding doors onto the terrasse; then round the corner ( almost central in photo) another window to dining area, then the smaller window demarcates the larger lounge area with another set of sliding doors, followed by a study/3rd. bedroom and lastly, a bedroom on the far right.
pixel
Dining area and lounge area.
pixel
Supporting lintels in place.
pixel
Front Door.
pixel
Garage entrance
pixel
The fireplace will be in front of this central wall...the hall behind, entrance to the kitchen on the LHS.
pixel
Family bathroom and another bedroom opening onto terrasse.
pixel
From inside the lounge
pixel
We have a Dombe pond opposite the entrance to the ground.
pixel
The "charpente" ( I think roof timbers in English) arrive tomorrow ... if the weather holds..............roof on by Christmas, windows and blinds installed in January.

I apologise if members find this boring...but it's an informative method of keeping track for me and to look back on later!
4 Comments
helys Wow !
... So, I wish you and your family a happy new year in this new sweet building !
helys · 2011-12-05: 11:29
revenant It's calling "roofing" as well, Mrs Kheops. Very impressive and rather exciting. What's a Dombe pond?
revenant · 2011-12-05: 11:36
danrav Thanks for the great progress report Marilyn. It's really moving along.
danrav · 2011-12-05: 12:43
lelle Is it yours house ??
lelle · 2011-12-05: 13:00
Bold Text
Italic Text
UnderLine Text
URL Link
pixel

Name
URL
pixel


Views: 215
Category: Building
pixel
Tagged: building dec 5th 2011
« 
pixel
 »
pixel