Building Progress...5th Dec.

by Marilyn Grimble December. 05, 2011 2107 views

The “charpente” ( I think roof timbers in English) arrive tomorrow … if the weather holds…………..roof on by Christmas, windows and blinds installed in January.

I apologise if members find this boring…but it's an informative method of keeping track for me and to look back on later!

From the LHS…garage, kitchen with back door entrance, dining area with sliding doors onto the terrasse; then round the corner ( almost central in photo) another window to dining area, then the smaller window demarcates the larger lounge area with another set of sliding doors, followed by a study/3rd. bedroom and lastly, a bedroom on the far right.

Dining area and lounge area.

Supporting lintels in place.

Front Door.

Garage entrance

The fireplace will be in front of this central wall…the hall behind, entrance to the kitchen on the LHS.

Family bathroom and another bedroom opening onto terrasse.

From inside the lounge

We have a Dombe pond opposite the entrance to the ground.

  Be the first to like this post
Join the conversation
3
There are 3 comments, add yours!
Lennart Andersson 5 years, 10 months ago

Is it yours house ??

5 years, 10 months ago Edited
Stefan Fletcher 5 years, 10 months ago

It's calling "roofing" as well, Mrs Kheops. Very impressive and rather exciting. What's a Dombe pond?

5 years, 10 months ago Edited
Olga Helys 5 years, 10 months ago

Wow !
... So, I wish you and your family a happy new year in this new sweet building !

5 years, 10 months ago Edited
Up
Copyright @Photoblog.com